Battery Charger for use with M12 Batteries

Subtotal (1 unit)*

£89.27

(exc. VAT)

£107.12

(inc. VAT)

Add to Basket
Select or type quantity
In Stock
  • 27 unit(s) ready to ship
Need more? Click ‘Check delivery dates’ to find extra stock and lead times.
Units
Per unit
1 +£89.27

*price indicative

RS Stock No.:
264-045
Mfr. Part No.:
4932430555
Brand:
Milwaukee
Find similar products by selecting one or more attributes.
Select all

Brand

Milwaukee

Series

C4

Battery Type

Li-Ion

For Use With

M12 Batteries

Battery Charge Time

80min

RoHS Status: Exempt

COO (Country of Origin):
CN

Milwaukee Series C4 Battery Charger, 80min Battery Charge Time, Li-Ion Battery


This M12™ 4 Bay Charger is designed for Li-Ion batteries, offering exceptional performance in battery management. With the capability to charge up to four M12 batteries sequentially, it ensures optimal efficiency for professionals in the automation, electronics, electrical, and mechanical industries.

Features & Benefits


• Enables charging of four batteries in sequence
• Integrated hang holes facilitate vertical mounting
• Compact design saves space in work environments
• Operates on AC power for consistent performance
• Wall mountable for easy, versatile installation

Applications


• Used with M12 batteries for power tools
• Ideal for users requiring quick battery turnaround
• Suitable for workshop and job site
• Streamlines battery management in industrial settings

How does the sequential charging feature enhance battery management?


The sequential charging feature optimises the charging process by focusing on one battery at a time, which helps ensure each battery receives the necessary power efficiently, reducing overall charge time and preventing overheating.

What is the maximum time required to fully charge a battery?


The device has a battery charge time of approximately 80 minutes, allowing users to return to work with minimal downtime.

How does the by-pass mode function?


The by-pass mode allows users to select which battery bay will begin charging first, catering to the immediate needs of the user and maximising uptime on critical projects.