Siemens Current Monitoring Relay, 3 Phase, SPDT
- RS Stock No.:
- 255-0846
- Mfr. Part No.:
- 3RR24422AA40
- Brand:
- Siemens
Subtotal (1 unit)*
£263.08
(exc. VAT)
£315.70
(inc. VAT)
FREE delivery for orders over £50.00
Temporarily out of stock
- Shipping from 07 November 2025
Need more? Click ‘Check delivery dates’ to find extra stock and lead times.
Units | Per unit |
---|---|
1 + | £263.08 |
*price indicative
- RS Stock No.:
- 255-0846
- Mfr. Part No.:
- 3RR24422AA40
- Brand:
- Siemens
Specifications
Technical Reference
Legislation and Compliance
Product Details
Find similar products by selecting one or more attributes.
Select all | Attribute | Value |
---|---|---|
Brand | Siemens | |
Monitoring Application | Current | |
Electrical Phase | 3 | |
Contact Configuration | SPDT | |
Voltage Sensitivity | Overvoltage, Undervoltage | |
Select all | ||
---|---|---|
Brand Siemens | ||
Monitoring Application Current | ||
Electrical Phase 3 | ||
Contact Configuration SPDT | ||
Voltage Sensitivity Overvoltage, Undervoltage | ||
- COO (Country of Origin):
- CZ
The Siemens current monitoring relays for IO-Link are suitable for the load monitoring of motors or other loads. In three phases they monitor the rams value of AC currents for overshooting or undershooting of set threshold values. Whereas apparent current monitoring is used above all in connection with the rated torque or in case of overload, the active current monitoring option, which is also selectable, can be used to observe and evaluate the load factor over a motor's entire torque range. It measured value transmission to a controller, including resolution and unit, may be parameterizable as to which value is cyclically transmitted.
Automatic reparametrizing when devices are exchanged
Simple duplication of identical or similar parameterizations
Reduction of control current wiring
Elimination of testing costs and wiring errors
Reduction of configuration work
Simple duplication of identical or similar parameterizations
Reduction of control current wiring
Elimination of testing costs and wiring errors
Reduction of configuration work